• دوشنبه تا شنبه: 10:00 - 16:00 / یکشنبه تعطیل است

AN OVERVIEW OF BORD AND PILLAR MINING METHOD

2,3,4,5B Tech Final Year Student, Dept. of Mining Engineering, Godavari Institute of Engineering & Technology (Autonomous), Rajahmundry, Andhra Pradesh. Abstract: The significance of …

به خواندن ادامه دهید

Optimum Utilisation of Continuous Miner for Improving Production …

miner technology in board and pillar mining is the best option, which does not require areas, whereas it can al so be . applied where develop ment has alread y been done.

به خواندن ادامه دهید

Bord and pillar applications on the platinum mine: T-cut …

The T-cut mining method is basically a partial pillar extraction method. The pillar (13 m x 13 m) created by the bord and pillar development is being stoped (only the UG2 reef) out for 2 m from the roadways on all sides, to leave an effective pillar of 9 m x 9 m. This method creates the

به خواندن ادامه دهید

1. Methods OF Mining

METHODS OF MINING. In board and pillar panels worked in conjection with hydraulic stowing extraction line preferred is. a. Straight line b. None of the above c. Steep diagonal d. Step diagonal. The minimum distance between two sections should be if one working at floor and one at top. a. 6m b. 8m c. 4m d. 3m

به خواندن ادامه دهید

Board & Pillar? | Coal, Colliery and Mining Forum.

Bord and pillar, (same as board I guess), Post and Stall, Stall Worked, and here is one up for grabs, for some reason I cannot shake off the thought that I recall this method being referred to as Pillar and Post locally at least, I know that it seems to be nonsensical by virtue of both terms being support methods, but we are a queer lot in this corner anyway (tail-gate …

به خواندن ادامه دهید

(PDF) Pillar Design and Coal Strength

Nearly all design pillar formulae are based on geometrical parameters of pillars resulting from empirical investigations, with primary focus on the pillar width-to-height (W/H) ratio and ...

به خواندن ادامه دهید

Beginners Guide to Room and Pillar Mining

Once the deposit has been fully mined, perhaps the most common option is "retreat mining." This method has been criticized in recent years because it's extremely risky both to workers and local geology.. This technique involves strategically removing the remaining pillars, causing the roof to collapse and the productive area to be filled in by the overburden.

به خواندن ادامه دهید

Bord and Pillar Method of Working | PDF | Mining …

The document discusses the bord and pillar method of underground coal mining. It involves driving parallel roads called bords separated by coal pillars. Development involves driving the bords and pillars, followed by depillaring …

به خواندن ادامه دهید

Hard-rock room and pillar mining best practice …

Centre for Mechanised Mining Systems at the University of the Witwatersrand The Centre for Mechanised Mining Systems at the University of the Witwatersrand recently organized a Hard Rock Room and Pillar Mining Best Practice Industry Workshop. Eleven different mining companies and mining operations from Southern Africa shared the details of how

به خواندن ادامه دهید

Bord and Pillar Method of Working | PDF | Coal …

The document discusses the bord and pillar method of underground coal mining. It describes how the method involves driving a series of parallel roads separated by blocks of coal (pillars) to develop the mine. After development, the pillars …

به خواندن ادامه دهید

coal mining | PPT

16. Mining operations 1. clearing the land of trees and vegetation, 2. removing and storing the top layers of the unconsolidated soil (topsoil), 3. drilling the hard strata over the coal seam, 4. fragmenting or blasting the hard …

به خواندن ادامه دهید

Bord & Pillar – Mining Science and Technology

As bord and pillar workings are developed roof support becomes a major consideration and operating cost item. Support requirements vary considerably and are dependent on the physical conditions in the seam, which are often depth dependent, and the length of time that the workings are required to be serviceable. ... In underground mining, first ...

به خواندن ادامه دهید

Bord and pillar applications on the platinum mine: T-cut …

The mining layout is exactly the same as that of the normal bord and pillar layout (see Figure 3). The bords are 4 m wide and pillar sizes are 13 m x 13 m, thus creating centres of 17 m. The …

به خواندن ادامه دهید

OPTIMIZATION OF MECHANIZED MINING LAYOUT …

• Bord and pillar (1.8 m–2.2 m stope widths using low-profile (LP) mechanized equipment) • Breast mining (1.3 m stope width using extra-low profile (XLP) mechanized equipment) A graphical representation of the bord and pillar and mechanized breast mining methods is shown in Figure 1 and Figure 2. It is important to note that the ...

به خواندن ادامه دهید

Opencast mining overview | PPT

Opencast mining, also called open-pit or open-cut mining, involves removing mineral resources from the earth through large pits or holes dug on the surface. It has advantages like high coal extraction rates, mechanization, and fewer safety hazards than underground mining. However, it also causes issues like land degradation, deforestation ...

به خواندن ادامه دهید

Bord and Pillar Method-Handouts | PDF | Coal Mining

Bord and Pillar Method-Handouts - Free download as PDF File (.pdf), Text File (.txt) or read online for free. The document discusses the bord and pillar mining method. It describes the applicability of the method, including seam thickness and depth. It also covers the classification of bord and pillar systems into developing the entire area into pillars or using a panel system.

به خواندن ادامه دهید

Mechanised room & pillar

Mechanised room and pillar Where the targeted, flat dipping mineralised material exceeds a thickness of generally more than 1.6m, mechanised room and pillar methods are considered. Although the volumetric extraction is relatively low in certain cases, the level of mechanisation is high. Back to underground mining Room and pillar mining is one of the first…

به خواندن ادامه دهید

Bord-and-pillar mining in inclined orebodies

The dimensions of the 16 West excavations were designed to fit the functional dimensions of machines into. Figure 1—Cross section through bord-and-pillars. the dimensions of the …

به خواندن ادامه دهید

pillar mining methods

The bord and pillar method of mining is suited to work flat coal seams of average thickness and at shallow depths. Coal seams of 1.8 to 3 m thickness are best suited for this method, though …

به خواندن ادامه دهید

DUST CONTROL IN ROOM AND PILLAR COAL MINING …

DUST CONTROL IN ROOM AND PILLAR COAL MINING USING IMPROVED SCRUBBERS AND IMPROVED SPRAY CONFIGURATIONS. Mine Ventilation Symposium - 2008 Reno, NV. Y. P. Chugh 1, A. S. Patwardhan 2,1, H. G. Gurley 1 & R. C. Carty 3 1 Department of Mining and Mineral Resources Engineering Slideshow...

به خواندن ادامه دهید

Bord and Pillar Method-Handouts | PDF | Coal …

The document discusses the bord and pillar mining method. It describes the applicability of the method, including seam thickness and depth. It also covers the classification of bord and pillar systems into developing the entire area into …

به خواندن ادامه دهید

Bord and Pillar Method of Working | PDF | Coal Mining

The document discusses the bord and pillar method of underground coal mining. It describes how the method involves driving a series of parallel roads separated by blocks of coal (pillars) to develop the mine. After development, the pillars are extracted in the depillaring stage. Key aspects covered include statutory provisions, equipment used, pillar design considerations, …

به خواندن ادامه دهید

GEOTECHNICAL ASPECTS OF BORD AND PILLAR MINING …

geotechnical aspects of bord and pillar mining at ensham bbugs - powerpoint ppt presentation. aug 19, 2020 •414 likes •772 views. geotechnical aspects of bord and pillar mining at ensham bbugs presentation 29 th may 2014 gordon geotechniques outline of presentation mine layout engineering geology mining method mining horizon production

به خواندن ادامه دهید

Solved It is assumed that a room and pillar mining …

It is assumed that a room and pillar mining operation will be conducted in a seam-type deposit of ore at a depth below surface of 4 0 0 meters. The average density of the waste rock in the overlying hanging wall approximates 2 5. 4 6 kN / m 3. the ore exhibits an unconfined compressive strength approximating 2 5. 6 Mpa.

به خواندن ادامه دهید

STUDY OF SUPPORT SYSTEM IN BOARD AND PILLAR …

Support Behaviors during Short-wall Mining of Developed Bord and Pillar Workings Proc. Of National Seminar on Mining Technology-Present and Future 21-22 September 2007, Bhubaneswar. 5. Bieniawski's, Z.T., (1989), "Engineering Rock Mass Classification—a Complete Manual for Engineers and Geologists in Mining Civil and

به خواندن ادامه دهید

Bord-and-pillar mining in inclined orebodies

tivity, cost implications, profit and mining flexibility and the most suitable layout was chosen. Bord-and-pillar mining was then compared to conven-tional mining according to the following: financial analysis, dilution and flexibility. Conclusions could now be drawn to the appropriateness of bord-and-pillar mining in Vlakpoort and Moddergat ...

به خواندن ادامه دهید

Task 2.5

the current bord and pillar mining practices. Vast potential exists for the increased utilization of the coal resource through the application of pillar extraction mining methods, especially at greater depth. This holds large economic value as well, despite increased environmental management costs.

به خواندن ادامه دهید

A review of the pillar design methodology for manganese mining …

This study describes a review of the pillar design at the manganese mining operations in South Africa with specific reference to Nchwaning III Shaft at Black Rock Mine Operations. From a literature study, it is clear that there is uncertainty regarding hard rock pillar strength and the appropriate formulae to use when designing hard rock bord ...

به خواندن ادامه دهید

Bord and Pillar Method of Working | PDF

The document discusses the bord and pillar method of underground coal mining. It involves driving parallel roads called bords separated by coal pillars. Development involves driving the bords and pillars, followed by depillaring …

به خواندن ادامه دهید

Bord and pillar mining – Coal and coal mining

geotechnical aspects of bord and pillar mining at ensham bbugs presentation – 29 th may 2014 gordon geotechniques. outline of presentation • mine layout • engineering geology • mining …

به خواندن ادامه دهید